Toolbox

Toolbox home

Map of the Toolbox

Toolbox search

Quick search

All tools

Submit a tool

Demonstrations

FAQ

Toolbox Survey

Main Categories

[French version]

LLIN Distribution Systems Toolkit

LLIN Distribution Systems ToolkitThese tools present opportunities for streamlining LLIN distribution by decentralizing the delivery process. Many steps are involved and they are explained in the tools. Some comparative experiences are illustrated. Benefits include reduced costs, reduced time to availability of the LLINs, and the potential for increased ownership of the process at peripheral levels, thereby paving the way for sustained control measures.

Download:
Strengthening systems for distributing insecticide-treated mosquito nets in Zambia in English, in French
Optimized insecticide-treated net (ITN) distribution solutions for scaling up malaria control in English, in French



 

Tool Designer Organization:
RBM Partnership

Contacts:
Paul Libiszowski, MACEPA



Summary of main features

Purpose
Share lessons learned in decentralized distribution of LLINS.

Scope of interventions
Systems for making available LLINS at the district level and below.

Limitations
These tools may apply to a limited number of countries, and geographic situations and may apply in their entirety or partially.

Output
Lower distribution costs, faster delivery times, and decentralized control of the LLIN distribution process.

Time-frame
This tool applies to mass distribution of LLINs shipped from the exterior of a country for delivery to lower points in the supply chain within the country. This process normally occurs during a period of approximately 4 months from procurement to delivery but may take from 2 to 6 months.

Potential users
National malaria control programmes and partners involved in procuring, importing and distributing LLINs.

Skills required
Logistics, Community mobilization

Type of software
Adobe PDF

User manual available
The tools represent documentation of lessons learned for an approach to mass distribution of LLINs. Together they provide the information needed to implement a similar approach.

Type and length of training required
Preparation and consultation for period of one month prior to implementation is recommended.

Available languages
English/French

Country applications
Zambia

Last update and version
March 2009